{"id":4685,"date":"2021-03-07T12:49:57","date_gmt":"2021-03-07T17:49:57","guid":{"rendered":"https:\/\/www.respectmyplanet.org\/publications\/?p=4685"},"modified":"2026-01-16T15:50:09","modified_gmt":"2026-01-16T20:50:09","slug":"redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","status":"publish","type":"post","link":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","title":{"rendered":"Redlands Passenger Rail Project Update &#8211; America&#8217;s 1st Hydrail >90% Complete"},"content":{"rendered":"\n<p>Construction on the 9-mile Arrow corridor almost 90% complete and bridge construction almost 100% complete.&nbsp; Crews continue working on setting the rail along the corridor; installing signals including cabling at the grade crossings; paving and reconstructing curbs, gutter, and sidewalks; installing perimeter fencing along the corridor where needed; completing the installation of underground utilities and drainage systems; and preparing for train testing.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1185\" height=\"746\" src=\"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail.jpg\" alt=\"\" class=\"wp-image-6816\" srcset=\"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail.jpg 1185w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail-300x189.jpg 300w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail-1024x645.jpg 1024w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail-768x483.jpg 768w\" sizes=\"auto, (max-width: 1185px) 100vw, 1185px\" \/><figcaption class=\"wp-element-caption\"><em>Construction workers pour concrete at the Waterman Avenue crossing of the upcoming hydrogen passenger rail project in San Bernadino, California.<\/em><\/figcaption><\/figure>\n\n\n\n<div>The Arrow is scheduled to begin service in spring 2022 and will run between the San Bernardino Transit Center located at Rialto Avenue and E Street in Downtown San Bernardino adjacent to San Manuel Stadium and will terminate at the University of Redlands. The regional rail service will integrate with other modes of transportation such as cars, buses, and bicycles and will offer residents, businesses, and visitors a new option for live, work, and play.<\/div>\n\n\n\n<div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1185\" height=\"750\" src=\"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail2.jpg\" alt=\"\" class=\"wp-image-6817\" srcset=\"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail2.jpg 1185w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail2-300x190.jpg 300w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail2-1024x648.jpg 1024w, https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/SanBernadinoHydrail2-768x486.jpg 768w\" sizes=\"auto, (max-width: 1185px) 100vw, 1185px\" \/><figcaption class=\"wp-element-caption\"><em>Crews install a drainage system at the Mill Street crossing of America&#8217;s first hydrogen powered rail project in San Bernadino, California.\u00a0 \u00a0The project is over 90% complete according to information published by San Bernadino County Transportation Authority.<\/em><\/figcaption><\/figure>\n\n\n\n<p>RMP published a detailed post explaining every aspect of this hydrogen rail project on February 2, 2020 (just over 1 year ago).&nbsp; &nbsp;You can read that post by <a rel=\"noopener\" href=\"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/usas-first-hydrogen-passenger-rail-san-bernadino-california\" target=\"_blank\">clicking here<\/a> to learn more details about the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction on the 9-mile Arrow corridor almost 90% complete and bridge construction almost 100% complete.&nbsp; Crews continue working on setting the rail along the corridor; installing signals including cabling at the grade crossings; paving and reconstructing curbs, gutter, and sidewalks; installing perimeter fencing along the corridor where needed; completing the installation of underground utilities and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4686,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[109],"tags":[],"class_list":["post-4685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fuel-cells"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Redlands Passenger Rail Project Update - America&#039;s 1st Hydrail &gt;90% Complete - respectmyplanet.org<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Redlands Passenger Rail Project Update - America&#039;s 1st Hydrail &gt;90% Complete - respectmyplanet.org\" \/>\n<meta property=\"og:description\" content=\"Construction on the 9-mile Arrow corridor almost 90% complete and bridge construction almost 100% complete.&nbsp; Crews continue working on setting the rail along the corridor; installing signals including cabling at the grade crossings; paving and reconstructing curbs, gutter, and sidewalks; installing perimeter fencing along the corridor where needed; completing the installation of underground utilities and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\" \/>\n<meta property=\"og:site_name\" content=\"respectmyplanet.org\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/respectmyplanet\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-07T17:49:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-16T20:50:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"652\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Matt Wandel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@respectmyplanet\" \/>\n<meta name=\"twitter:site\" content=\"@respectmyplanet\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Matt Wandel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\"},\"author\":{\"name\":\"Matt Wandel\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#\\\/schema\\\/person\\\/644a43cc26fc267d7dbc58c83dfc570a\"},\"headline\":\"Redlands Passenger Rail Project Update &#8211; America&#8217;s 1st Hydrail >90% Complete\",\"datePublished\":\"2021-03-07T17:49:57+00:00\",\"dateModified\":\"2026-01-16T20:50:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\"},\"wordCount\":237,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/HydrailMap_title.png\",\"articleSection\":[\"Fuel Cells\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\",\"url\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\",\"name\":\"Redlands Passenger Rail Project Update - America's 1st Hydrail >90% Complete - respectmyplanet.org\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/HydrailMap_title.png\",\"datePublished\":\"2021-03-07T17:49:57+00:00\",\"dateModified\":\"2026-01-16T20:50:09+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage\",\"url\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/HydrailMap_title.png\",\"contentUrl\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/HydrailMap_title.png\",\"width\":1100,\"height\":652},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/fuel-cells\\\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Redlands Passenger Rail Project Update &#8211; America&#8217;s 1st Hydrail >90% Complete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#website\",\"url\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/\",\"name\":\"respectmyplanet.org\",\"description\":\"RMP is 501(c)3 non-profit organization registered in Michigan.  We are committed to protecting fresh water resources by advocating for: sustainable energy production, hydrogen fuel cell vehicles, remediating environmental pollution &amp; rethinking waste management.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#organization\",\"name\":\"respectmyplanet.org\",\"url\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/rmp_logo750x750.jpg\",\"contentUrl\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/rmp_logo750x750.jpg\",\"width\":750,\"height\":750,\"caption\":\"respectmyplanet.org\"},\"image\":{\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/respectmyplanet\\\/\",\"https:\\\/\\\/x.com\\\/respectmyplanet\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.respectmyplanet.org\\\/publications\\\/#\\\/schema\\\/person\\\/644a43cc26fc267d7dbc58c83dfc570a\",\"name\":\"Matt Wandel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g\",\"caption\":\"Matt Wandel\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Redlands Passenger Rail Project Update - America's 1st Hydrail >90% Complete - respectmyplanet.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","og_locale":"en_US","og_type":"article","og_title":"Redlands Passenger Rail Project Update - America's 1st Hydrail >90% Complete - respectmyplanet.org","og_description":"Construction on the 9-mile Arrow corridor almost 90% complete and bridge construction almost 100% complete.&nbsp; Crews continue working on setting the rail along the corridor; installing signals including cabling at the grade crossings; paving and reconstructing curbs, gutter, and sidewalks; installing perimeter fencing along the corridor where needed; completing the installation of underground utilities and [&hellip;]","og_url":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","og_site_name":"respectmyplanet.org","article_publisher":"https:\/\/www.facebook.com\/respectmyplanet\/","article_published_time":"2021-03-07T17:49:57+00:00","article_modified_time":"2026-01-16T20:50:09+00:00","og_image":[{"width":1100,"height":652,"url":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","type":"image\/png"}],"author":"Matt Wandel","twitter_card":"summary_large_image","twitter_creator":"@respectmyplanet","twitter_site":"@respectmyplanet","twitter_misc":{"Written by":"Matt Wandel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#article","isPartOf":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete"},"author":{"name":"Matt Wandel","@id":"https:\/\/www.respectmyplanet.org\/publications\/#\/schema\/person\/644a43cc26fc267d7dbc58c83dfc570a"},"headline":"Redlands Passenger Rail Project Update &#8211; America&#8217;s 1st Hydrail >90% Complete","datePublished":"2021-03-07T17:49:57+00:00","dateModified":"2026-01-16T20:50:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete"},"wordCount":237,"commentCount":1,"publisher":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/#organization"},"image":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage"},"thumbnailUrl":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","articleSection":["Fuel Cells"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","url":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete","name":"Redlands Passenger Rail Project Update - America's 1st Hydrail >90% Complete - respectmyplanet.org","isPartOf":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage"},"image":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage"},"thumbnailUrl":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","datePublished":"2021-03-07T17:49:57+00:00","dateModified":"2026-01-16T20:50:09+00:00","breadcrumb":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#primaryimage","url":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","contentUrl":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","width":1100,"height":652},{"@type":"BreadcrumbList","@id":"https:\/\/www.respectmyplanet.org\/publications\/fuel-cells\/redlands-passenger-rail-project-update-americas-1st-hydrail-90-complete#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.respectmyplanet.org\/publications\/"},{"@type":"ListItem","position":2,"name":"Redlands Passenger Rail Project Update &#8211; America&#8217;s 1st Hydrail >90% Complete"}]},{"@type":"WebSite","@id":"https:\/\/www.respectmyplanet.org\/publications\/#website","url":"https:\/\/www.respectmyplanet.org\/publications\/","name":"respectmyplanet.org","description":"RMP is 501(c)3 non-profit organization registered in Michigan.  We are committed to protecting fresh water resources by advocating for: sustainable energy production, hydrogen fuel cell vehicles, remediating environmental pollution &amp; rethinking waste management.","publisher":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.respectmyplanet.org\/publications\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.respectmyplanet.org\/publications\/#organization","name":"respectmyplanet.org","url":"https:\/\/www.respectmyplanet.org\/publications\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.respectmyplanet.org\/publications\/#\/schema\/logo\/image\/","url":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2025\/10\/rmp_logo750x750.jpg","contentUrl":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2025\/10\/rmp_logo750x750.jpg","width":750,"height":750,"caption":"respectmyplanet.org"},"image":{"@id":"https:\/\/www.respectmyplanet.org\/publications\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/respectmyplanet\/","https:\/\/x.com\/respectmyplanet"]},{"@type":"Person","@id":"https:\/\/www.respectmyplanet.org\/publications\/#\/schema\/person\/644a43cc26fc267d7dbc58c83dfc570a","name":"Matt Wandel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a5d7106df0db540d0faab91539c58464e022659b6bb548d0055c7a125ca6131f?s=96&d=identicon&r=g","caption":"Matt Wandel"}}]}},"jetpack_featured_media_url":"https:\/\/www.respectmyplanet.org\/publications\/wp-content\/uploads\/2021\/03\/HydrailMap_title.png","jetpack_shortlink":"https:\/\/wp.me\/p4XGsh-1dz","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/posts\/4685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/comments?post=4685"}],"version-history":[{"count":4,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/posts\/4685\/revisions"}],"predecessor-version":[{"id":6818,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/posts\/4685\/revisions\/6818"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/media\/4686"}],"wp:attachment":[{"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/media?parent=4685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/categories?post=4685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.respectmyplanet.org\/publications\/wp-json\/wp\/v2\/tags?post=4685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}