Statevolt Imperial Valley Battery Manufacturing Plant
2029 Century Park East Suite 400N
Los Angeles   CA 90067

Brief Location Profile:

Statevolt aims to be a leading player in the energy transition with Gigafactories in strategic U.S. locations. Its hyperlocal model prioritizes sustainability and a domestic supply chain for American-made batteries.

Location Info:
Supply Chain Segment Midstream
Supply Chain Type electrode_cell_manfac
Operational Status planned
Product Type Other/ Unknown cells
Product Other/ Unknown
Operator Website LAUNCH!
Production Capacity 54
Unit Of Measure GWh/yr
No Of Employees 2500

Nearby Related Locations

Nanotech Energy
Los Angeles CA • 3.3 mi
Quallion LLC
Sylmar CA • 17 mi
Linova Energy
Monrovia CA • 24.8 mi
ALEC
Carlsbad CA • 91.6 mi
Lithion Battery, Inc.
Henderson NV • 234.5 mi

Link(s) Related To This Location:

This location does not have any web links to show