Damietta LNG Plant
Egypt
Damietta  

Brief Location Profile:

Segas liquefaction terminal (Gas natural Fenosa / Eni 80% - EGAS 10% - EGPC 10%) of Damietta. Production capacity: 5.5 Mt / year with 2 liquefaction trains. Storage capacity: 300,000 m3 in 2 tanks of 150,000 m3. http://www.gasnaturalfenosa.com/ http://www.eni.com/en_IT/home.html

Location Info:
Country Egypt
City Damietta
Terminal Status Online
Owner Segas (Gas natural Fenosa/Eni 80% - EGAS 10% - EGPC 10%)
Operator Website LAUNCH!
Storage Capacity M3 300000
Storage Tanks 2
First Cargo 0000-00-00

Nearby Related Locations

Egyptian LNG Plant
• 84.8 mi
Marsa El Brega LNG Plant
• 723.9 mi
IRAN LNG Terminal
• 1249.8 mi
Ras Laffan NFE LNG Terminal
• 1256.6 mi
RasGas 1-2-3-&-4 LNG Plants
• 1258.1 mi

Link(s) Related To This Location:

This location does not have any web links to show