Paradox Basin Brine Project
38.51675080 / -109.72853730
   UT
Location Info:
Supply Chain Segment Upstream
Supply Chain Type raw_material
Operational Status prospect
Product Type Cathode Raw Materials
Product Lithium
Operator Website LAUNCH!

Nearby Related Locations

Green Energy Lithium Project
UT • 4.6 mi
Paradox Lithium Project
Moab UT • 10.5 mi
Green River project
UT • 31.8 mi
Utah Lithium Project
UT • 32.7 mi
Lisbon Valley Lithium Project
UT • 39.8 mi

Link(s) Related To This Location:

This location does not have any web links to show